Standard Description
Equipped with the zero leak bidirectional checking sole-noid valves, this energy unit is built for your operation of two independent circuits. Which are respectively for the main and subordinate platforms in the double scissors lift. Two cut-off valves are applied for lowering the machine manually in case of power loss. If additional independent circuits are expected for your application please get in touch with us for availability.
Remark: one. Please seek the advice of our revenue engineer to the distinct pump displacement, motor electrical power or tank capacity.
2. CSA or UL certified motors are available on request.
Exclusive Notes
one. The AC motor is of S3 duty cycle, which might only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all the hydraulic components concerned prior to installation of the energy unit.
three. Viscosity with the oil shoud be 15~46 cst,as well as the oil should be clean and free of impurities,N46 hydraulic oil is advised.
4. The power unit must be mounted vertically.
5. Check the oil degree within the tank immediately after the first running in the energy unit.
6. Oil modifying is required soon after the original one hundred operation hrs,afterwards as soon as every 3000 hours.